CLOUDEK · EXAMPLE DELIVERABLE

Workspace migration
planning sample.

This sample demonstrates a planning handoff for a hypothetical Microsoft 365 to Google Workspace transition. It describes decisions to make; it does not establish compatibility, a delivery date, migration capability, or a successful move.

✓ Fictional values only✓ Plan, not migration✓ Unknowns and approvals visible

Training example — not a customer plan. Both environments, scope, work items and decisions are invented. No tenant was accessed, no data was copied, and no settings were changed.

SAMPLE-MIG-01 · FICTIONAL DATE 2026-01-12

Example Workshop · M365 to Google Workspace planning

Status: Fictional planning-format sample · Source: source.example.test · Destination: destination.example.test · Approval: none. Reserved example.test names are not real tenants.

Purpose and boundary

Illustrate how an operator could organize a readiness discussion for one explicitly named source, destination and selected workload set. This sample assumes no inventory was supplied. Every item below is a question or proposed gate, not a finding about either environment.

WorkloadPlanning questionEvidence / ownerStatus
Mail and calendarWhich item types, shared resources, archive states, aliases and coexistence needs are in scope?Customer-selected minimized inventory; workload owner TBDNot assessed
Files and collaborationWhich sites, drives, permissions, links and sharing rules are included or excluded?Customer-selected inventory and data owner TBDNot assessed
Identity and domainsHow will sign-in, groups, aliases, service identities and domain verification be handled?Identity owner and domain administrator TBDNot assessed
Devices and applicationsWhich clients, mobile devices, integrations and retention obligations depend on the current platform?Customer application / endpoint owners TBDNot assessed

Readiness gates

  1. Confirm authority and scope. Name source and destination owners, selected object classes, exclusions, residency constraints, and the authorized evidence channel. No access or collection is authorized by this sample.
  2. Resolve prerequisites. Confirm licensing, administrator roles, vendor-supported workloads, quotas, domain ownership, identity mapping, retention, security controls, and coexistence requirements with the responsible owners.
  3. Review collisions and exceptions. Have named owners resolve duplicate addresses, aliases, groups, privileged/service identities, unsupported objects, permissions, archives and hold requirements. Inventory parsing alone cannot decide these.
  4. Approve a pilot separately. Choose a customer-authorized representative test set, define source/destination reconciliation checks and stop criteria, and record who may approve any live migration action.

Illustrative phase plan

PhaseExit evidenceDecision ownerState
DiscoveryAccepted scope, exclusions, dependency and responsibility registerCustomer sponsor + delivery ownerProposed only
ReadinessReviewed mapping exceptions, licensing and vendor-tool confirmationWorkload and identity ownersBlocked on evidence
PilotWritten pilot approval, test cases, reconciliation and rollback decisionChange authorityNot authorized
CutoverApproved change record, confirmed window, communications and stop/rollback thresholdsCustomer change authorityNot authorized
CloseoutAccepted outcome, unresolved exceptions, support owner, retention/deletion recordNamed customer ownerNot started

Dates and durations: intentionally unset. No duration or availability can be inferred before evidence review, vendor confirmation, capacity review and an accepted written quote.

Cutover and rollback questions

Decision register

DecisionOwnerCurrent stateGate
Confirm workloads, exclusions and source of truthFictional customer sponsorOpenBefore quoting a final plan
Select and license migration toolingFictional technical ownersOpenIndependent compatibility and security review
Approve pilot or production workFictional change authorityNot approvedSeparate written scope and action approval

Sample acceptance criteria for a future scoped plan

A customer could accept a planning deliverable when it names the agreed environments and workloads, lists assumptions and exclusions, identifies unresolved decisions and responsible owners, records proposed pilot checks and stop conditions, and distinguishes every unapproved execution step. These are example criteria only; actual acceptance must be agreed in the customer-specific written scope.

Limitations

This is not an assessment, compatibility statement, migration tool, schedule, quotation or statement of work. No M365 or Google API connection exists in this sample; no Graph or Google permissions are requested; no tenant-wide export, data copy, DNS change, identity change, cutover, rollback test or post-migration support was performed. A completed planning document would not authorize execution. Keep customer exports, credentials and reports outside this repository.

Discuss a possible planning scope

Direction, workloads, availability, fee, delivery method and terms require written confirmation before work begins.